Previous Page  83 / 112 Next Page
Information
Show Menu
Previous Page 83 / 112 Next Page
Page Background

MARCH 2015 \ BUILDING DIALOGUE \

83

Photos by Cooperthwaite

Photography + Productions

FACING PAGE:

The new Saint

Joseph Hospital was

constructed in

32 months.

TOP LEFT:

The chapel provides a

quiet, contemplative

space for families.

TOP RIGHT:

The chapel entry

incorporates glass-

stone mosaic murals

that were relocated

from original hospital.

RIGHT:

Every floor has direct

access to fresh air,

outdoor space and

scenic views of

downtown Denver.

FOLLOWING PAGE:

The second-floor

waiting area features

abundant natural light

and outdoor access.