MARCH 2015 \ BUILDING DIALOGUE \

59

cables are pulled and the slab is raised by

the embedded lifting mechanisms 6 inch-

es to 10 inches, depending on the soil swell

potential. The building is then constructed

directly on the structural slab.

The advantages of this system include:

• Elimination of the crawlspace;

• A shallower floor thickness;

• A reduction in the number of piers;

• Future

adjustability o

f the floor; and

• The end of the “floating slab!”

This system provides a main-level com-

mercial floor that will not move due to

supporting soil heave. Storefront doors

scraping on floating slab floors are no

longer an issue. The cost of this system is

cheaper than conventional pier-and-grade

beam systems and most overexcavation

schemes. While Colorado Foundation

Solutions is the sole provider of the lifting

mechanisms for this patented floor/foun-

dation system in Colorado, any adequately

trained crew can install the slab. And any

structural engineer familiar with two-way

flat slab post-tensioning systems can pro-

vide the design.

\\

jclarke@rmg-engineers.com

TRENDS

in Floor Construction

This new slab system is ideal for Colorado’s sensitive soil.

ELECTRIC VEHICLE CHARGING IS THE NEXT

"MUST HAVE" AMENITY

info@nationalcarcharging.com

209 Kalamath St., Suite 3, Denver, CO 80223

Phone: (303) 437-4947

STATION MANAGEMENT

CONSULTING

EQUIPMENT

Authorized

Distributor

With a wide variety of choices,

we can custom tailor the right

solution for your project.

National Car Charging Ad CMYK mode.pdf 1 10/16/14 2:06 PM